Transportation
PRINCIPALES REFERENCIAS

Year:
2006
Client:
MINISTRY IN ASTURIAS REGIONAL GOVERNMENT OF ENVIRONMENT, INFRASTRUCTURES AND LAND POLICY
Location:
Cerredo Mountain pass, Asturias, Spain
Contract cost:
40.634.568,80 €
Services provided:
- Construction Project
Description:
The present works have a total length of approximately 3,930 m. Rañadoiro tunnel, one of the most important constructions of the project has a total length of 1,874 meters.
The road originally had a width section of just 6 meters, steep slopes, no berms on both sides of the road and a small tunnel at 1,181 meter high over the sea level frequently closed during winter time due to severe snow storms.
The new road projected has the following features:
- Two 3.50 meter lanes along 4 km approximately, with extra width in the curves and 0.50 meters berms on both sides of the road.
- A new tunnel with a total length of 1,867 meters
- Three bridges with a total width section of 12 meters and the following lengths:
- Bridge nº1: 100.8 meters
- Bridge nº2: 81.6 meters
- Bridge nº3: 100.8 meters