Electrical and energy
PRINCIPALES REFERENCIAS
Burying of the 220kV power line “Ferreros – Carrió” due to land development works in San Claudio, Oviedo

Year:
2006
Client:
HIDROCANTÁBRICO
Location:
Oviedo, Asturias, Spain
Contract cost:
3.676.040,00 €
Services provided:
- Preliminary Design
Description:
The Project aims to facilitate land development in the Urban Plots named: AUS-SCN “San Claudio Norte”, AUS-SCV “San Claudio-Los Valles” and AUS-PTN “El Pontón”, thanks to the burying of a 919 m Power Line stretch from the HVPL: (220kV) FERREROS-CARRIÓ, RHAE 127/220kV 1x2500S+T3T5 / 1457 m, System CROSS-BONDING.
