Hydraulic

PRINCIPALES REFERENCIAS

Fontoria water treatment plant and deposit along with the replacement of the pipe conduction in Paladeperre and Carlangas (Valdes)
STATION DE TRAITEMENT EN EAU POTABLE ET RÉSERVOIR DE FONTORIA ET RÉNOVATION CONDUITE PALADEPERRE ET CARLANGAS, VALDÉS

Year:
2007

Client:
MINISTRY IN ASTURIAS REGIONAL GOVERNMENT OF ENVIRONMENT AND RURAL DEVELOPMENT

Location:
Valdés, Asturias, Spain

Contract cost:
5.822.656,32 €

Services provided:

  • Construction Project

Description:

Replacement of the current asbestos cement pipe conduction for a new cast iron one, with higher capacity volumes for future situations, is planned.

Layout is designed through accessible areas (paths, tracks, or local roads), reducing the number of crossings and invasions to private lands. This point has a relevant importance, since the “Rio Negro” river bank is considered a Place of Communitarian Interest according to “Red Natura 2000”.

Buscar proyectos

Buscar proyectos

Proyectos relacionados

    Volver a resultados de búsqueda
     
    SUBVENCIÓN PARA LA PROMOCIÓN INTERNACIONAL 2010

  • Presentación y catálogos de la empresa en inglés, francés y portugués
  • Estudios de mercado para Panamá y Argelia
  • 6 Viajes de prospección a Argelia

  • ...