Electrical and energy
PRINCIPALES REFERENCIAS
Hydroelectrical use of the water supply system of Cantabria (Toranzo hydro power plant)

Year:
2008
Client:
HIDROCANTÁBRICO
Location:
Santander, Spain
Contract cost:
4.066.844,23 €
Services provided:
- Feasibility Study
Description:
Preliminary study is designed with the aim of detailing the required works and installations for the energy harness on the approximately 685.10 meters gross head produced between sections IV-1 and IV-2 in the municipality of Corvera de Toranzo. As a result, greater energy efficiency and a reduction in the exploitation costs of the whole system are obtained.