Maritime
PRINCIPALES REFERENCIAS

Year:
2008
Client:
MINISTRY IN ASTURIAS REGIONAL GOVERNMENT OF INFRASTRUCTURES, LAND POLICY AND HOUSING
Location:
Carreño, Asturias, Spain
Contract cost:
33.222.853 €
Services provided:
- Preliminary Design Project
Description:
The aim of the present Preliminary Design Project was to propose the necessary works to achieve a better sheltering for all the docks against the sea surge. In this way, better conditions for berthing in the fishing and marina installations are obtained, and the rate of sedimentation, due to sands coming from next beaches, is reduced or even avoided.
The proposed works are based on the “Study of alternatives” carried out previously in the context of the same project.