Electrical and energy
PRINCIPALES REFERENCIAS
New substation “La Mayacina” 30/12kV, Mieres

Year:
2007
Client:
TECUNI
Location:
Mieres, Asturias, Spain
Contract cost:
1.675.360,43 €
Services provided:
- Project
Description:
The substation, as a whole, excepting the access and exit buildings and some other ventilation elements, are located underground.
In this way, the entire substation (transformers, switch gears, cells, control, protection, communication and auxiliary service equipments) is located in an underground building with the following dimensions:
- 20x30 m Rectangular ground plant.
- 6 meters maximum height + 1meter extra deep for the layout of power and control cable.