Environmental
PRINCIPALES REFERENCIAS

Year:
2000
Client:
COGERSA
Location:
Valle de la Zoreda, Asturias, Spain
Contract cost:
27.543.819,65 €
Services provided:
- Geotechnical – Geological Study.
- Project.
Description:
This project was conducted in five phases due to its considerable importance:
1) Sealing of the current dump site: The aim is to define works required to seal a dump site of 270,000 m2.
2) Expansion, Phase I: The aim is to define works required for the adaptation of the end of Zoreda´s valley for its use as waste dump site. The volume expanded in Phase I is of 2,086,704 m3 with a total area of 214,768.66 m2.
3) Composting plant: The project details the necessary works for the construction of the vegetal waste treatment plant as well as 3 industrial warehouses for the fermentation and storage.
4) Expansion, Phase II: The aim is to define works required for the construction of the dumpsite structure during the second phase of the expansion, with a total surface of 153,648 m2.
5) Sealing of the industrial waste dump site: In this project, the aim is to achieve the closure of municipal solid waste dumpsite, which reached a total height of 54 m, and the closure of the lower part of the discharge of industrial waste.